Energy Management
Your calendar has 24 equal hours; your brain doesn't. Schedule to the curve.
Time management quietly assumes all hours are interchangeable. They're not, and you know they're not: the 9 AM you and the 3 PM you are practically different employees. Energy management is the correction — match the difficulty of work to the quality of the hour, and the same day produces more with less strain.
This is the most Fokus-native concept on this list, because the app models it directly: every task carries an energy level, and your day carries an energy map.
The two halves
Tasks have weight. In Fokus, every task is light, moderate, or extensive (*light in Spotlight, or let TEA infer it). Filing expenses is light. Designing the architecture is extensive. Be honest — the schedule only works if the labels do.
Days have shape. In AI Scheduling settings you set peak hours (when you're sharp — say 9–12 and 14–16) and rest hours (sleep, lunch — when nothing gets scheduled at all). There's even a chronotype: morning larks and night owls get different defaults.
Then the scheduler does the matching
With both halves in place, Smart Scheduling pairs them automatically: extensive work gravitates into peak hours, light tasks fill the energy valleys, and nothing lands in rest hours. You stop spending willpower deciding when to do hard things — they're simply where they belong when you get there.
You can see the balance working in Analytics: the energy distribution chart shows whether your week is all-extensive burnout bait or a sustainable mix.
Habits that keep the curve honest
- Audit for a week. If you're consistently dragging at your "peak" hours, your settings describe who you wish you were. Move them. The app schedules for the real you.
- Guard the valleys too. Light tasks in low-energy hours aren't lost time — they're the recovery that makes the next peak possible. A day of only extensive blocks is a bad week in disguise.
- Use energy for triage. Exhausted at 4 PM with an hour left? Filter Kanban by light and win anyway — three small completions beat one abandoned big one.
How is this guide?